Construction Scheduler – West Point, VA
@Curtis Contracting, Inc. posted 4 weeks agoJob Description
Job Description/Summary
The Scheduler will work with project management teams in developing schedules, from Bidding/Proposal through commission and turnover to owner. This individual works with the VP of Operations and project management team to monitor and control project schedules to enhance project execution.
Job Requirements/Qualifications
Develop, monitor, control and update in depth project schedules using Primavera software to ensure projects are optimally executed
Assist in planning and developing detailed engineering and construction baseline schedules for projects including cost loading and CPM scheduling
Analyze drawings, specifications and statements of work in the preparation of activity networks for project resource planning and scheduling.
Assist in reviewing project schedules with the project management teams to ensure compliance with contract, reviewing progress and reporting variances
Maintain communications and support the interchange of information between the project and other involved agencies.
Assist estimating in developing preconstruction schedules and proposal schedules.
Analyze progress reports against the schedules for projects.
Visit construction sites to evaluate the actual construction status relative to proposed schedule and budget.
Analyze the impacts of changes to schedules and cost proposals by developing and maintaining fragnets and performing time impact analysis
Manage multiple projects simultaneously.
Undergraduate degree in engineering, architecture, construction management or a related discipline
5-7 years scheduling experience on similar size and scope construction projects.
Advanced proficiency in Primavera (P6) software; experience using software to analyze project schedule risk.
Experience working on construction projects with CPM and cost loaded schedules.
Enterprise/server based scheduling a plus.
Detail oriented and can manage multiple priorities in a fast paced environment
Skilled at developing relationships with owners, subcontractors, senior leaders and project teams.
High degree of initiative, personal responsibility, and integrity.
Passion for the work and industry a must.
Benefits
Health and Dental Insurance
401K Program
Profit Sharing
Paid Holidays
Paid Leave
Curtis Contracting, Inc. (CCI) is a class ‘A’ contractor prequalified with VDOT and has been in business since 1985. We are separated into multiple divisions including the Civil division, Heavy Highway division, Road/Bridge Maintenance division, and Federal division. CCI has a large equipment fleet and self performs all aspects of construction management, site work, utilities, demolition, heavy highway, and cast-in-place concrete. Curtis Contracting, Inc. was founded on the principles of ethics, partnering, quality, integrity, safety and environmental stewardship. These principles and hard work are carried out through our leadership team. CCI has a large equipment fleet and self performs all aspects of construction management, site work, utilities, demolition, heavy highway, cast-in-place concrete, installation of divisions 8 & 10 items, and erection of pre-engineered metal structures. We hope you join our team!
If interested, please call or text 804-837-9996 or the office 804-843-3350. Visit our website at http://www.curtiscontracting.net/careers/ for all of our job postings.
***Curtis Contracting, Inc. is an equal opportunity employer, including disabled and veterans***
Related Jobs
-
Patient Care Assistant
- @ Columbus Springs
- Columbus, OH
-
Discharge Coordinator
- @ Columbus Springs
- Columbus, OH
-
Ohio Outpatient Therapist
- @ Columbus Springs
- Columbus, OH
-
Audit Manager, Non for Profit
- @ Beech Valley Solutions
- Columbus, OH
-
District Manager
- @ Mr. Tire Auto Service Centers
- Columbus, OH